Project name: | Waste dump Chodov, phase IV. | |
Client: | SATER CHODOV spol. s r.o. | |
Price: | 12 300 000 CZK | |
Completed: | 2008 | |
Description: |
Expansion of the existing waste dump for area of 200x50, excavation of about 40,000 cubic meters of soil, forming the dump, perform soil stabilization 12,000 square meters liming and compaction perform of the geological barrier by foils HDPE tl.1,5mm 12,000 m2 with a protective layer of geotextiles. Drainage and degassing three wells was also carried out.
|